I’d Call It Blue Dragon Stadium

 
 


Posted by Drew458    United States   on 05/21/2009 at 01:29 PM   
 
  1. $5 Billion for 1 million KW per year
    I wonder how many dollars per GW that is shut eye 
    or even how much per KWH for just the roof

    Posted by nosmo    United States   05/21/2009  at  08:24 PM  

  2. And the payback timing is making a huge assumption....

    No maint. on the facility for the next 30 years. No cells crapping out, no wiring going bad or corroding. No grid issues with power, no battery storage issues....

    The average life of a cell is 25-40 years. So, this will never pay back what it was to invest in it.

    But, the up side is that there is much less yearly costs associated with it. As the money going back to the facility from sale of power will defray a lot of costs that would have been money spent. It still is better than a normal stadium. So, good for them. I hope it works out well, really.

    Posted by B3    United States   05/21/2009  at  09:06 PM  

  3. Well, 5 billion Taiwan dollars. Which is about $24.95. No seriously, it’s about $151 million US at current exchange rates.

    And I thought power generation was given in GWh - gigawatt HOURS. A bit difficult figuring out things otherwise.

    I thought the building was really cool looking though. So much so that I made a new post category for architecture. It’s an interest Peiper and I share.

    Posted by Drew458    United States   05/21/2009  at  09:40 PM  